Quality Assurance/Control Mechanical Engineer (Data Center Construction) | No travel restrictions
- 3-month contract with good possibility of extension and subsequent projects
- Contract role, full-time on site
- South-central Texas
- Industrial building construction quality assurance experience, with emphasis on mechanical systems
- Commissioning experience
- Very good spoken and written English
- Unrestricted ability to travel/relocate within the continental USA
INTRODUCTION:
Since 1991, AB Consulting GSS has provided specialized project support and technical
expertise to the manufacturing and construction industries. One of our key
engagements involves supporting the development of a major new facility in Southcentral
Texas. Join our team and be part of impactful projects that shape the future of
industrial innovation.
JOB DESCRIPTION:
The Project QC/QA Mechanical Engineer will work in a fast-paced construction
environment under the direction of the Commissioning Manager. The Project QC/QA
Engineer will support the commissioning of mechanical systems for a confidential Mission
Critical data center project. This role ensures that all mechanical systems are installed,
tested, and functioning according to design specifications, industry standards, and client
requirements. The ideal individual will have a strong background in Louvers, HVAC,
Chillers, plumbing, CRAC units, exhaust systems, and fire protection systems, with
experience in high-reliability and clean environments.
TYPE: 1099 Independent Contractor
START DATE: As soon as possible
DURATION: 3 months with good chance of extension.
MAJOR RESPONSIBILITIES:
- Review mechanical system designs, submittals, and installation plans for compliance with project specifications.
- Witness and verify mechanical system testing such as but not limited to: Louver operations, HVAC, Chillers, TAB, CRAC units, exhaust systems, and fire suppression.
- Conduct inspections and document deficiencies, ensuring corrective actions are implemented.
- Collaborate with contractors, engineers, and OFCI and CFCI commissioning agents to coordinate testing schedules and resolve issues.
- Maintain detailed commissioning logs, test reports, and punch lists.
- Ensure systems meet operational readiness and performance standards before turnover.
- Support integrated systems testing and final acceptance procedures. (L2/L3 to IST)
- Enforce safety protocols and ensure compliance with local codes and standards.
- Commissioning Support:
- Collaborate with commissioning agents, contractors, and engineers to execute commissioning scripts and procedures.
- Document and report deficiencies, track corrective actions within Compass and or Nexus, and ensure resolution prior to turnover.
- Quality Control & Compliance:
- Implement and maintain quality control protocols throughout the commissioning lifecycle.
- Ensure all mechanical work complies with applicable codes, standards, and project specifications.
- Maintain detailed inspection logs, punch lists, and quality documentation.
- Issue resolution compliance and knowledge within Mission Critical platform to document and resolve.
- High level of LOTO familiarity and activities.
- Enforce safety standards and procedures during all inspection and testing activities in accordance with site specific requirements.
- Identify potential risks and recommend mitigation strategies to ensure safe and reliable operation.
QUALIFICATIONS:
- At least 4 years of hands-on experience in the mechanical discipline, with a strong understanding of construction technologies, equipment, materials, and methods specific to this field.
- Data center construction experience required.
- Experience in mechanical commissioning. Mandator in Mission Critical environments.
- Familiarity with Microsoft’s CXPOR 8.2 or latest version, ASHRAE standards, NFPA codes, and commissioning best practices.
- Strong understanding of LOTO, Louvers, HVAC, chillers, plumbing, CRACs, and fire protection systems.
- Ability to read and interpret mechanical drawings and specifications.
- Excellent communication and documentation skills.
- Proficiency in commissioning software and CXPOR 8.2,Microsoft Office Suite, Microsoft CX Compass and Nexus.
- Certification in commissioning (e.g., ACG, BCA, NEBB) is a plus.
Job Type: Contract
Pay: $75.00 - $85.00 per hour
Benefits:
Application Question(s):
- 1. Are you an American or Canadian citizen, or are you a US permanent resident?
- 2. Are you willing to work on a contract basis (W-9/1099)?
- 3. This is a 3‑month project with a strong possibility of extension and additional projects. Are you comfortable with this duration?
- 4. If future projects arise elsewhere in the U.S., are you willing and able to relocate as needed?
- 5. Are you willing to work in a construction environment and support a project team on site?
- 6. How many years of QA/QC mechanical engineering experience do you have in industrial or data center construction projects?
- 7. How many years of commissioning experience do you have working with agents, contractors, and engineers? Please describe the type of commissioning work you’ve performed across your projects.
- 8. Do you have experience with large‑scale data center construction projects? If so, please describe your involvement, including details such as project scope, type of data center, approximate budget in USD, and the end user.
- 9. Can you describe your experience overseeing contractors and subcontractors, specifically how you ensured their work met project specifications, quality standards, and required documentation?
- 10. How familiar are you with inspection and commissioning methods for mechanical facility systems? Please specify which systems you have experience with (e.g., HVAC, chillers, CRAC units, plumbing, fire protection, exhaust, louvers, etc.).
- 11. Using percentages (totaling 100%), how would you classify your QA/QC, supervision, and commissioning experience across the following disciplines?
- Electrical (MV/LV)
- Mechanical/HVAC
- Civil/Structural
- Piping/Plumbing
- 12. Can you describe your experience working with Cx systems, including any responsibilities you’ve had performing or supervising daily LOTO procedures during construction or commissioning phases?
- 13. Can you walk me through a time when you implemented or maintained quality control protocols on a project? What was your role, and which specific processes or tools did you use?
- 14. Have you worked on data center or other mission‑critical projects where strict uptime requirements and zero‑failure expectations were central to daily operations? If so, please describe your role
- 15.This position is on-site in Austin, Texas. Are you willing to relocate or travel there for the project?
Work Location: In person